The Biden-Harris Green Crown Jewel Just Shattered — Literally

Both Joe Biden and Kamala Harris have been enthusiastic about the kind of wind-power project that just failed catastrophically in the Northeast.

Share this story

Turbines at Orsted’s offshore wind farm near Nysted, Denmark, September 4, 2023.

Tom Little/Reuters

A major offshore-wind-power project approved by the Biden-Harris administration was shuttered last week after a turbine dramatically shattered, spewing sharp fiberglass shards onto nearby beaches and into the Atlantic Ocean.

Lifeguards now patrol the beaches in full body personal protective equipment and thick gloves while participating in cleanup to protect from the severe dangers of shattered fiberglass shards, which can cause serious health problems. Six beaches in Nantucket, Mass., and the surrounding area are closed because of the risks involved in cleanup. Dangerous shards of the turbine from Vineyard Wind are still washing up on the beach. The turbines were about 13 nautical miles south of Martha’s Vineyard and were part of the country’s second-largest offshore wind farm.

Andrew Follett

About the Author

Andrew Follett

Andrew Follett conducts research analysis for a nonprofit in the Washington, D.C., area. He previously worked as a space and science reporter for the Daily Caller News Foundation.

Comments

Advertisement

Advertisement